The walls of the original separate bathroom
and toilet were removed and extended to create a larger
bathroom. A refurbished plumbing and electrical installation was
created within the insulated studwork. A walk-in shower with
glass screen was installed together with vanity unit & toilet.
All tiling both wall and floor was renewed.
At the same time, both windows were replaced with
uPVC as well as the very low made-to-measure exterior door.